viernes, 30 de marzo de 2012

Valve opening fixture

Finally done, but i need to modify it to allow to open 2 valves at once.



miércoles, 21 de marzo de 2012

catalytic converter

welded the catalytic converter for civic B (beagle). not my best welds.


testing flowbench

need to calibrate the fp1 processor, but it's working already.


lunes, 19 de marzo de 2012

Flowbench

I have been busy making my own flowbench at the garage. It's almost done.
Need to buy a shop vacuum and thats it.